Alliance Bank in Sulphur Springs

Paris District Road Report for the Week of August 9, 2021

Paris — Here’s a look at work planned in the district during the week of Aug. 9, 2021. These schedules are subject to change due to weather conditions, equipment failure or other unforeseen issues. Motorists are advised to remain alert and pay special attention to all signs, barricades and traffic controls, and reduce their speed as they approach and travel through work zones. They should also avoid distractions such as cell phones, eating, drinking, or car audio or navigation systems.

Sherman Area (Fannin, Grayson Counties)

Contacts: Sherman Area Office (903) 892-6529; Grayson Co. Maintenance (903) 893-8831; Fannin Co. Maintenance (903) 583-7566.

The annual contract to perform seal coat operations in Grayson County has started. Daytime lane closures will be present during seal coat operations and drivers should expect delays. The following roadways in Grayson County will be sealed this year; US 69 from Martin Luther King Street to US 75; SH 160 from SH 11 to the Collin County line; FM 691 from FM 131 south to FM 131 north; FM 131 from FM 691 to FM 120; FM 131 from US 82 to FM 691; SH 289 from the Collin County line to SH 56; and FM 121 from SH 289 to FM 3356.

US 69, Grayson County: from FM 1897 in Bells to SH 11 in Whitewright. Watch for daytime lane closures as crews perform base repairs on the roadway. Work is expected to begin Aug. 9.  

US 75, Grayson County: from FM 1417 to SH 91 (Texoma Parkway). Watch for shoulder closures and lane shifts on the northbound and southbound US 75 main lanes between SH 91 and FM 1417 as crews work on building new main lanes, bridges, and retaining walls. Watch for lane closures on the frontage roads between FM 1417 and SH 91 as crews work on building detours and installing drainage structures. The northbound Washington Street exit ramp is currently closed and exiting traffic is requested to use the Houston/Lamar Street exit ramp. The southbound exit ramp for Park Avenue is currently closed and exiting traffic is requested to use the Lamar/Houston Street exit. A reduced speed limit of 60 mph on the US 75 mainlanes has been set for this construction project. 

Northbound and Southbound US 75 mainlane traffic has been shifted onto the existing frontage road near West Staples Street and transitions back to the existing mainlanes near West Cherry Street. This operation will allow for reconstruction of the proposed US 75 mainlanes and the bridge over Center Street. Within this area, the US 75 frontage road traffic has been reduced to a single travel lane, while US 75 mainlane traffic still maintains two travel lanes. Both mainlane and frontage road traffic are separated by concrete barriers. 

All eastbound and westbound lanes of Center Street under US 75 are closed to traffic. To detour, eastbound Center Street traffic will turn right on the southbound US 75 frontage road, turn left on Park Avenue, and turn left on the northbound US 75 frontage road to return to Center Street. Westbound traffic will turn right on the northbound US 75 frontage road, turn left on Houston Street, and turn left on the southbound US 75 frontage road to return to Center Street.

Video animations of the northbound US 75 mainlane traffic switch and Center Street detour can be viewed online at:

  • Southbound US 75 mainlane traffic switch:

Northbound and Southbound US 75 mainlane traffic has been shifted onto the existing frontage road from just north of Houston Street and transitions back to the existing mainlanes south of North Travis Street. This operation will allow for reconstruction of the proposed US 75 mainlanes and the bridge over Washington Street. Within this area, the US 75 frontage road traffic has been reduced to a single travel lane, while US 75 mainlane traffic still maintains two travel lanes. Both mainlane and frontage road traffic are separated by concrete barriers. 

All eastbound and westbound lanes of Washington Street under US 75 are closed to traffic. This closure is necessary to complete work in preparation of the mainlane detour. To detour, eastbound Washington Street traffic will turn right on the southbound US 75 frontage road, turn left on Lamar Street, and turn left on the northbound US 75 frontage road to return to Washington Street. Westbound traffic will turn right on the northbound US 75 frontage road, turn left on North Travis Street, and turn left on the southbound US 75 frontage road to return to Washington Street.

Video animations of the northbound US 75 mainlane traffic switch and Washington Street detour can be viewed online at:

  • Northbound US 75 mainlane traffic switch:
  • Southbound US 75 mainlane traffic switch:
  • Detour for the Washington Street closure at US 75:

US 75, Grayson County: at the US 82 intersection. Watch for shoulder closures on the northbound and southbound US 75 main lanes between North Loy Lake Road and Lamberth Street as crews work on building new exit ramps. Watch for shoulder closures and lanes shifts on the eastbound and westbound US 82 main lanes between FM 131 and Loy Lake Road while crews perform bridge construction. Watch for lane closures and lane shifts for the frontage roads at the US 75 and US 82 intersection as crews work on bridge construction and construction of new frontage road lanes.

The westbound US 82 exit ramp for Loy Lake road is currently closed for crews to work on widening the US 82 frontage road. Traffic wishing to access Loy Lake Road is requested to take the SH 91 exit ramp (# 643), or the US 75 exit ramp.

The US 75 pedestrian bridge near Pecan Street in Sherman is closed to pedestrian traffic. The pedestrian bridge has been removed. Pedestrians wishing to cross US 75 are advised to cross at the Houston Street signalized intersection. 

FM 1417, Grayson County: from US 82 to SH 56. Watch for lane shifts and shoulder closures between US 82 and SH 56 while crews are working to construct the second portion of the new Sand Creek bridge and the approaches to the bridge. Watch for occasional daytime lane closures as crews perform utility work. A reduced speed limit of 45 mph has been set for this construction project.

SH 289, Grayson County: in Gunter at the FM 121 intersection. Watch for occasional lane closures as construction crews work on installing a traffic signal at the intersection.

FM 131, Grayson County: in Sherman at the Northcreek Drive intersection. Watch for occasional lane closures as construction crews work on installing a traffic signal at the intersection.

US 69, Grayson County: in Bells at the FM 1897 intersection. Watch for occasional lane closures as construction crews work on installing a traffic signal at the intersection.

Yellow Bridge Road (CR 876), Grayson County: Yellow Bridge Road (CR 876) is closed to through traffic at the branch of Pilot Grove Creek so that construction crews can remove and replace the bridge. Local traffic will need to use an alternate roadway such as Brewer Road or County Road 534.

US 75 full depth concrete repair, Grayson County: Crews will be working on US 75 each week from Sunday night through Thursday night. Lane closures will be present at night for crews to replace failed concrete. Lane closures will begin at 7:30 p.m. each night and should be reopened to traffic by 6 a.m. This work will extend from the Collin-Grayson County line to the Oklahoma State line.

US 69/US 75, Grayson County: at the Red River bridge. Watch for occasional daytime lane closures as crews work to upgrade and replace the existing bridge railing on the bridge and guardrail approaches on the northbound and southbound bridges at the Red River. Watch for lane shifts and narrow lanes throughout the project as crews have shifted traffic to provide room for construction.

FM 121, Grayson County: from Jim Jones Road to FM 3356. Watch for occasional daytime lane closures as crews work to build portions of the new bridges and roadway. Watch for lane shifts and narrow lanes throughout the project as crews have moved traffic to a portion of the new concrete pavement. The ultimate roadway will be a five-lane section consisting of concrete pavement when the project is completed.  

US 377, Grayson County: Willis Bridge at the Oklahoma State line. Watch for occasional lane closures on the existing bridge as workers pour concrete for the new bridge structure.

US 377, Grayson County: from US 82 to FM 901. Watch for temporary daytime lane closures and shoulder closures as workers install sloped end treatments on pipes and install guardrail.

US 75 debris pickup, Grayson County: from Collin County line to Oklahoma State line. Watch for mobile lane closures as workers pick up debris from the roadway every Monday, Wednesday and Friday during the daytime.

FM 120, Grayson County: from SH 289 to Cemetery Road. Watch for daytime lane closures as maintenance crews blade level the roadway.

FM 697, Grayson County: from SH 11 to FM 2729. Watch for daytime lane closures as maintenance crews blade level the roadway.

The annual contract to perform seal coat operations in Fannin County begins the second week of August weather permitting. Daytime lane closures will be present during seal coat operations and drivers should expect delays. The following roadway in Fannin County will be sealed this year; SH 56 from Loop 205 in Bonham to US 82 in Honey Grove.

FM 1753, Grayson and Fannin County: from FM 1897 to SH 78. Watch for temporary one-lane closures as workers rehab and widen the roadway.

FM 898, Fannin County: from the Grayson County line to SH 121. Watch for temporary one-lane closures as workers rehab and widen the roadway.

FM 824, Fannin County: from SH 56 in Honey Grove to the Lamar County line. Watch for temporary one-lane closures as workers rehab and widen the roadway.

FM 1550, Fannin County: from County Road 3330 to SH 34. Watch for temporary one-lane closures as workers rehab and widen the roadway.

SH 121, Fannin County: from the Collin County line to SH 56. Watch for temporary daytime lane closures and shoulder closures as workers install sloped end treatments on pipes and install guardrail.

US 82, Fannin County: from SH 121 to the Lamar County Line. Watch for slow moving construction equipment as crews work on widening US 82 from a two-lane roadway to a four-lane divided roadway. Westbound US 82 traffic has been shifted to the new pavement for the entirety of the project from the Lamar County line to SH 121. Eastbound traffic between SH 121 and the Lamar County line has been opened to two lanes, but occasional daytime lane closures may be present. Drivers who frequent this roadway are advised that all driveways, county roads and farm-to-market roads approaching the new westbound main lanes on US 82 will have a full stop before crossing over to the median.

SH 11, Fannin County: from SH 121 to SH 78. Watch for daytime lane closures as maintenance crews blade level the roadway.

FM 896, Fannin County: from US 69  to Business SH 121 in Randolph. Watch for daytime lane closures as maintenance crews apply a fog seal to the roadway.

FM 981, Fannin County: from SH 78 to US 69. Watch for daytime lane closures as maintenance crews perform base repairs to the roadway.

Sulphur Springs Area (Hopkins, Franklin Counties):

Contacts: Sulphur Springs Area Office (903) 885-9514; Franklin Co. Maintenance (903) 537-4976; Hopkins Co. Maintenance (903) 885-4031.

FM 71, Hopkins County: From FM 3236 to Sulphur Bluff. Watch for lane closures and short traffic delays as crews work on rehabilitating the roadway.

Paris Area (Delta, Lamar, Red River Counties)

Contacts: Paris Area Office (903) 784-1357; Delta Co. Maintenance (903) 395-2139; Lamar Co. Maintenance (903) 785-4468; Red River Co. Maintenance (903) 427-3561.

US 79 at LP 286, Lamar County: Watch for workers and equipment while crews perform slope repair work.

US 271 at LP 286 interchange, Lamar County: Watch for workers and equipment while crews perform slope repair work.

FM 38, Lamar County: from US 82 to US 82. Watch for temporary lane and shoulder closures while crews improve drainage structures and upgrade bridge rail and metal-beam guard fence.

BU 82J, Red River County: between Travis Street and Columbia Street in Clarksville. The road will be closed and a marked detour will be in place while crews replace a cross drainage structure, install drainage inlets, and reconstruct the roadway and sidewalk in this area.

FM 195, Red River County: from the Lamar County line to SH 37. Watch for temporary lane and shoulder closures while crews improve drainage structures and replace bridge rail. The shoulder at Little Pine Creek will remain closed while the rail work is completed.

FM 1487, Red River County: from FM 909 to FM 910. Watch for temporary lane closures while crews widen and rehabilitate the existing pavement and improve drainage structures.

FM 911, Red River County: from BU 82K (Avery) to FM 44. Watch for temporary lane closures while crews rehabilitate the existing pavement and improve drainage structures.

SH 37, Red River County: from US 271 (Bogata) to the Franklin County line. Watch for work zones and drive safely through construction areas as final work is being performed.

BU 271D, Red River County: from US 271 to SP 38 (Bogata). Watch for work zones and drive safely through construction areas as final work is being performed.

US 82, Red River County: from FM 1159 to the Bowie County line. Watch for daytime lane closures while crews place final hot mix surface. 

Greenville Area (Hunt, Rains Counties)

Contacts: Greenville Area Office (903) 455-2363; Hunt Co. Maintenance (903) 455-2303; Rains Co. Maintenance (903) 473-2682.

FM 36, Hunt County: from FM 36 to FM 751 at various locations: The contractor has been forming and pouring concrete drainage structures on FM 1564. The contractor is working on culverts and safety end treatments on FM 1564 and will be placing chevrons on FM 1570, FM 751 and FM 36.

SH 276, Hunt County, from FM 36 to SH 34 (Quinlan Bypass): The contractor has placed project barricades and has prepared and cleared most of the right-of-way. Preliminary embankment, excavation, and bridge work has begun with all shafts being completed. This work should not affect existing traffic on SH 34 or SH 276. Roadway construction affecting closures on Spur 264 has begun, this work will affect through-traffic between Meyers Avenue to County Road 2304. Weekend work is to be expected. Please be aware of lane closures, and watch for work zones and workers when traveling in this area.

FM 1566, Hunt County: from FM 272 near Celeste to State Highway 34. The contractor has begun mile five of this seven-mile project and is currently reworking the subgrade and bringing in flex base, placing geogrid and compacting areas for roadway rehabilitation and widening. Please be aware of lane closures, and watch for work zones and workers when traveling in this area.

SH 66 at FM 1570, Hunt County: The contractor has finished placing the two-inch asphalt overlay surface layer and completed placing guardrail. Project striping is scheduled to begin early this week, weather permitting. Please be aware of lane closures, and watch for work zones and workers when traveling in this area.

Maintenance crews in Hunt County will be performing overlay operations on SH 11 between FM 2655 and FM 1563, near Wolfe City. Maintenance crews will also be performing overlay and spot base operations on FM 71 from BUS 11 to Delta County. Contract mowers will be operating throughout the county this week. Maintenance crews will also be sweeping on US 69 between Lone Oak and Greenville as needed. Maintenance contract crews will be performing debris removal on I-30 and guard rail repair at various locations around Hunt County. Contracted maintenance crews will be mowing various locations in Hunt County. 

Please be careful when traveling in these areas, watch out for workers and maintain a safe distance from work crews.

Maintenance crews in Rains County will be performing working on FM 513 at various locations. Crews will be performing various sign installations, potholing and debris removal. Maintenance crews will be performing herbicide operation on various roadways. Please watch for lane closures, work zones and workers along the roadway, and maintain a safe distance from work crews.

###

new TXDOT EndTheStreakTX logo
new TXDOT EndTheStreakTX logo

www.txdot.gov | TxDOT on Facebook | TxDOT on Twitter

Author: Matt Janson

Share This Post On